Fluting&Testliner Paper Production Line Cylinder Mould Type
Main Technical Parameter
1.Raw material | Old Carton,OCC |
2.Output paper | Testliner paper,Kraftliner paper,Fluting paper,Kraft paper,Corrugated paper |
3.Output paper weight | 80-300 g/m2 |
4.Output paper width | 1800-5100mm |
5.Wire width | 2300-5600 mm |
6.Capacity | 20-200 Tons Per Day |
7. Working speed | 50-180m/min |
8. Design speed | 80-210m/min |
9.Rail gauge | 2800-6200 mm |
10.Drive way | Alternating current frequency conversion adjustable speed, sectional drive |
11.Layout | Left or right hand machine |
Process Technical Condition
Old cartons →Stock preparation system→Cylinder mould part→Press part→Dryer group→Sizing press part→Re-dryer group→Calendering part →Reeling part→Slitting&Rewinding part
Process Technical Condition
Requirements for Water, electricity, steam, compressed air and lubrication:
1.Fresh water and recycled use water condition:
Fresh water condition:clean,no color,low sand
Fresh water pressure used for boiler and cleaning system:3Mpa、2Mpa、0.4Mpa(3 kinds) PH value:6~8
Reuse water condition:
COD≦600 BOD≦240 SS≦80 ℃20-38 PH6-8
2. Power supply parameter
Voltage:380/220V±10%
Controlling system voltage:220/24V
Frequency:50HZ±2
3.Working steam pressure for dryer ≦0.5Mpa
4. Compressed air
● Air source pressure:0.6~0.7Mpa
● Working pressure:≤0.5Mpa
● Requirements: filtering、degreasing、dewatering、dry
Air supply temperature:≤35℃
Installation, Test Run And Training
(1)The seller will provide technical support and send engineers for installation, test run the whole paper production line and training the buyer's workers
(2)As different paper production line with different capacity, it will take different time to install and test run the paper production line. As usual, for regular paper production line with 50-100t/d, it will take about 4-5months,but mainly depend on the local factory and workers’ cooperation situation.
(3)The buyer shall be responsible for the salary, visa, round trip tickets, train tickets, accommodation and quarantine charges for the engineers