Hot Selling for Napkin Paper Making Machine - Insole Paper Board Making Machine – Dingchen
Hot Selling for Napkin Paper Making Machine - Insole Paper Board Making Machine – Dingchen Detail:
1.Raw material | OCC,Waste papers |
2.Output paper | Insole Paper Board |
3.Output paper thickness | 0.9-3mm |
4.Output paper width | 1100-2100mm |
5.Wire width | 1350-2450 mm |
6.Capacity | 5-25 Tons Per Day |
7. Working speed | 10-20m/min |
8. Design speed | 30-40m/min |
9.Rail gauge | 1800-2900 mm |
10.Drive way | Alternating current frequency conversion adjustable speed, sectional drive |
11.Layout | Left or right hand machine |
Waste papers →Stock preparation system→Cylinder mould part→Press, cutting and paper off-loading part→Natural dry→Calendering part →Edge trimmed part→Printing machine
Requirements for Water, electricity, compressed air:
1.Fresh water and recycled use water condition:
Fresh water condition:clean,no color,low sand
Fresh water pressure used for boiler and cleaning system:3Mpa、2Mpa、0.4Mpa(3 kinds) PH value:6~8
Reuse water condition:
COD≦600 BOD≦240 SS≦80 ℃20-38 PH6-8
2. Power supply parameter
Voltage:380/220V±10%
Controlling system voltage:220/24V
Frequency:50HZ±2
3. Compressed air
Air source pressure:0.6~0.7Mpa
Working pressure:≤0.5Mpa
Requirements: filtering、degreasing、dewatering、dry
Air supply temperature:≤35℃
Product detail pictures:
Related Product Guide:
We will devote ourselves to providing our esteemed customers with the most enthusiastically thoughtful services for Hot Selling for Napkin Paper Making Machine - Insole Paper Board Making Machine – Dingchen , The product will supply to all over the world, such as: Bangladesh, Sweden, Jamaica, We adopted technique and quality system management, based on "customer orientated, reputation first, mutual benefit, develop with joint efforts", welcome friends to communicate and cooperate from all over the world.
By Bertha from Muscat - 2018.12.30 10:21
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Gloria from azerbaijan - 2018.05.13 17:00