New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen
New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen Detail:
(1) The warranty period for the main equipment is 12 months after successful test-run, including cylinder mold, head box, dryer cylinders, various rollers, wire table, frame, bearing, motors, frequency conversion controlling cabinet, electrical operation cabinet etc., but doesn’t include the matched wire, felt, doctor blade, refiner plate and other quick wearing parts.
(2) Within the warranty, the seller will change or maintain the broken parts for free (except for the damage by human error and the quick-wear parts)
Product detail pictures:
Related Product Guide:
continue on to further improve, to make sure product top quality in line with market and consumer standard requirements. Our firm has a excellent assurance program have already been established for New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen , The product will supply to all over the world, such as: Costa rica, Benin, Paris, With all these supports, we can serve every customer with quality product and timely shipping with highly responsibility. Being a young growing company, we might not the best, but we're trying our best to be your good partner.
By Elsie from Argentina - 2018.02.04 14:13
It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
By Gill from Haiti - 2017.02.14 13:19