New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen
New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen Detail:
(1) The warranty period for the main equipment is 12 months after successful test-run, including cylinder mold, head box, dryer cylinders, various rollers, wire table, frame, bearing, motors, frequency conversion controlling cabinet, electrical operation cabinet etc., but doesn’t include the matched wire, felt, doctor blade, refiner plate and other quick wearing parts.
(2) Within the warranty, the seller will change or maintain the broken parts for free (except for the damage by human error and the quick-wear parts)
Product detail pictures:
Related Product Guide:
Our business puts emphasis on the administration, the introduction of talented personnel, as well as the construction of team building, trying hard to further improve the standard and liability consciousness of staff members customers. Our enterprise successfully attained IS9001 Certification and European CE Certification of New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen , The product will supply to all over the world, such as: Philippines, El Salvador, Morocco, We maintain long-term efforts and self-criticism, which helps us and improvement constantly. We strive to improve customer efficiency to save costs for customers. We do our best to improve the quality of product. We will not live up to the historic opportunity of the times.
By Hilary from Rome - 2018.09.23 18:44
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Karl from Latvia - 2017.08.18 11:04