New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen
New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen Detail:
(1) The warranty period for the main equipment is 12 months after successful test-run, including cylinder mold, head box, dryer cylinders, various rollers, wire table, frame, bearing, motors, frequency conversion controlling cabinet, electrical operation cabinet etc., but doesn’t include the matched wire, felt, doctor blade, refiner plate and other quick wearing parts.
(2) Within the warranty, the seller will change or maintain the broken parts for free (except for the damage by human error and the quick-wear parts)
Product detail pictures:
Related Product Guide:
Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by providing worth added design and style, world-class producing, and repair capabilities for New Delivery for Straw Paper Production Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen , The product will supply to all over the world, such as: Slovakia, Milan, Grenada, Our team knows well the market demands in different countries, and is capable of supplying suitable quality products and solutions at the best prices to different markets. Our company has already set up a experienced, creative and responsible team to develop clients with the multi-win principle.
By Claire from Pretoria - 2018.02.21 12:14
This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
By James Brown from Liberia - 2018.12.28 15:18