New Fashion Design for Machine Paper Machine - Insole Paper Board Making Machine – Dingchen
New Fashion Design for Machine Paper Machine - Insole Paper Board Making Machine – Dingchen Detail:
1.Raw material | OCC,Waste papers |
2.Output paper | Insole Paper Board |
3.Output paper thickness | 0.9-3mm |
4.Output paper width | 1100-2100mm |
5.Wire width | 1350-2450 mm |
6.Capacity | 5-25 Tons Per Day |
7. Working speed | 10-20m/min |
8. Design speed | 30-40m/min |
9.Rail gauge | 1800-2900 mm |
10.Drive way | Alternating current frequency conversion adjustable speed, sectional drive |
11.Layout | Left or right hand machine |
Waste papers →Stock preparation system→Cylinder mould part→Press, cutting and paper off-loading part→Natural dry→Calendering part →Edge trimmed part→Printing machine
Requirements for Water, electricity, compressed air:
1.Fresh water and recycled use water condition:
Fresh water condition:clean,no color,low sand
Fresh water pressure used for boiler and cleaning system:3Mpa、2Mpa、0.4Mpa(3 kinds) PH value:6~8
Reuse water condition:
COD≦600 BOD≦240 SS≦80 ℃20-38 PH6-8
2. Power supply parameter
Voltage:380/220V±10%
Controlling system voltage:220/24V
Frequency:50HZ±2
3. Compressed air
Air source pressure:0.6~0.7Mpa
Working pressure:≤0.5Mpa
Requirements: filtering、degreasing、dewatering、dry
Air supply temperature:≤35℃
Product detail pictures:
Related Product Guide:
We continue to keep increasing and perfecting our solutions and service. At the same time, we operate actively to do research and enhancement for New Fashion Design for Machine Paper Machine - Insole Paper Board Making Machine – Dingchen , The product will supply to all over the world, such as: Vietnam, Cannes, Johor, For many years, we now have adhered to the principle of customer oriented, quality based, excellence pursuing, mutual benefit sharing. We hope, with great sincerity and good will, to have the honor to help with your further market.
By Mamie from India - 2018.12.10 19:03
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Maria from Oslo - 2017.06.25 12:48