Short Lead Time for Paper Manufacturing Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen
Short Lead Time for Paper Manufacturing Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen Detail:
(1) The warranty period for the main equipment is 12 months after successful test-run, including cylinder mold, head box, dryer cylinders, various rollers, wire table, frame, bearing, motors, frequency conversion controlling cabinet, electrical operation cabinet etc., but doesn’t include the matched wire, felt, doctor blade, refiner plate and other quick wearing parts.
(2) Within the warranty, the seller will change or maintain the broken parts for free (except for the damage by human error and the quick-wear parts)
Product detail pictures:
Related Product Guide:
Persisting in "High good quality, Prompt Delivery, Aggressive Price", we've established long-term cooperation with shoppers from each overseas and domestically and get new and previous clients' high comments for Short Lead Time for Paper Manufacturing Line - Stainless Steel Cylinder Mould in Paper Machine Parts – Dingchen , The product will supply to all over the world, such as: France, Austria, South Korea, Our business activities and processes are engineered to make sure our customers have access to widest range of products with the shortest supply time lines. This achievement is made possible by our highly skilled and experienced team. We look for people who want to grow with us around the globe and stand out from the crowd. We now have people who embrace tomorrow, have vision, love stretching their minds and going far beyond what they thought was achievable.
By Joyce from Barbados - 2017.03.28 12:22
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
By Nina from Rome - 2018.09.23 18:44